Construction Manager [Qatar]


 
  • This role will manage all assigned technical coordination / interfaces and CTR management and all regulatory approvals from Civils to Ooredoo network and onward to area interconnection with Company Tower Control room; this covers the full project phases from end of FEED through to transfer to Operations of the project. During the Project execution the job holder will manage the onsite contractor and coordinate with Package Lead / Phase team / FEED and EXECUTE contractors and their subcontractors, Site and Ooredoo personal and any other government body to achieve the project aim and provide guidance and priorities for the performance of their duties.
  • Holder will be based in the Major Projects premises or at contractor’s premises during EPC phase depending on overall execution plan. The Job holder belongs to the Phase team and reports directly to the Package Manager.




About this role
  • To adopt and demonstrate an exemplary behavior regarding HSSE and to implement HSSE rules and requirements within his area of responsibility.
  • To liaise with other interface engineers, all discipline engineers involved in the management of the project and with contractor personnel handling technical design and interfaces. The job holder shall also make sure that non contractual obligations are properly addressed by EPC contractor.
  • To manage the civils / telecoms and Ooredoo interface contractor on site
  • To organize and/or attend technical interface meetings as necessary.
  • To ensure consistence and correct design compliance both under area of responsibility and with other areas during the various phase of EPC detailed design, procurement, fabrication, installation and animate dedicated transverse technical, schedule and cost coordination between packages as required to ensure all requirements for EPC activities are complied with.
  • To ensure timely review of documentation by Company interfaces to identify clashes/conflicts.
  • To liaise with design engineers for IOC technology for scope to combine with the other Project elements.
  • To follow-up post FEED and EPCIC phases the progress of ESIA studies with HSEQ to ensure issuance of Consent to Construct certificate in due time to allow installation of the onshore cable
  • To review the EPCIC contractor SOW
  • To manage technical communication interface with Other Operators during end of FEED and EPCIC phases
  • To fully develop a relationship with Company and government entities for formal approvals of Company scope within Company and beyond
  • Put in place agreements with Other Company and government entities before start of FEED and or EXECUTE phase.
  • To follow up 3rd party interfaces (i.e., Logistic) during FEED and EPCIC phases
  • To attend all interface-related meetings, including in particular interface workshops, HAZID / HAZOP meetings, meetings with Contractor(s), etc. in order to ensure the permanent control of the battery limits.
  • To organize, control and follow up process to have all deliverables timely issued by contractors for all interfaces, and to control the quality of these deliverables during FEED and EPCIC phases.
  • To assist EPCIC Contractor(s), as required, in the closing out of interfaces. To expedite the exchange of Interface Task Sheet involving Contractor(s) as necessary.
  • To ensure that EPCIC Contractors provide proper reporting of the progress of their interfaces activities and ensure subsequently report on progress of interface management process implementation to Project Manager and refer to him in the event of any deviation or conflict with proposed remedial actions.
  • To avoid change orders and delays caused by interface issues by ensuring timely follow-up of interfaces during FEED and EPCIC phases. To anticipate problems and work together with Contractor(s), Engineering Manager and as a general manner with all discipline Engineers, to propose technical solutions.
  • To liaise with project team and discipline engineers on all interface matters and/or help expedite the development of the design process between Contractors during FEED and EPCIC execution phase.
  • To liaise with the Document Control team to assist consolidation of the technical review records for all project packages.
  • When necessary, participate in monitoring interfaces between different subcontractors of a main EPCIC contractor.
  • To resolve and chase Technical Queries and Derogations Requests in liaison with discipline engineers and Company Technical Reference Persons.
  • To timely report to the package Lead, highlighting progress and areas of concerns encountered in the performance of his duties.
  • To ensure confidentiality of all the documentation produced (whatever its support)
  • To ensure technical coordination between packages and in close coordination with Package Manager and Engineering Leads
  • To Ensure/Close follow-up of DER/TQ/SCN and the like during project execution in close coordination with MP Head QA/QC
  • Ensure readiness for all internal/external audits required (PR, Third parties, Partners)
  • Deputize Package Lead and Project Managers upon request on project management matters during project execution such as:
    • FEED close out
    • EPC CFT processes
  • EPC contract management and execution and Project Close out.



What you need to bring
  • Bachelor or master’s in engineering in a relevant discipline [CIVIL]
  • Professional Experience in Engineering / interface and Project Management (years): 10
  • Large spectrum of skill and competencies in various engineering disciplines and/or in Interface Management
  • Large spectrum of skill and competencies in various engineering disciplines and/or in Interface Management.
  • A good knowledge of Contractual matters would be necessary, and a good knowledge of Well Head Platforms Projects and Operations would be a plus.
  • Languages: English mandatory
  • Knowledge of relevant codes and standards and PLIC/Ooredoo working practices
  • H2S OPITO and T-BOSIET trainings useful



Benefits
  • Salary:
    • Day Rate in USD Plus Allowance
  • Work Schedule:
    • 9 Hours / 6 Days
  • Duration:
    • 31 December 2024 with possible extension
  • Location:
    • Doha – Qatar


Academic Bachelor

$ads={2}


 

.

$ads={1}

Post a Comment

Previous Post Next Post

نموذج الاتصال